Install as an app
1) Open Safari or Chrome browser
1.1) For Safari
2.2) For Chrome, open the menu
2) To the Home screen

Price list for public services provided by the "Government for Citizens" State Corporation 

1. Registration of pledges of non-movable property mandatory state registration:

Article 457 of the Tax Code:

1) from individuals - 1 rate of a monthly calculation indicator (hereinafter - MCI);
2) from legal entities - 5 MCI.

For issuing a duplicate of a certificate of registration of a pledge of movable property not subject to mandatory state registration - 0.5 MCI.

Appendix 5 to the Order of the Acting Minister for Investment and Development of the Republic of Kazakhstan dated January 26, 2016 No. 87 “On approval of prices for goods (work, services) produced and (or) sold by the State Corporation“ Government for Citizens ”:

  • For issuing a certificate of registration of a pledge of movable property not subject to mandatory state registration - 30.5 tenge;
  • For correction of errors in registration documents made through the fault of the applicant - 59.2 tenge.

2. Issuance of an extract from the registry of registration of pledges of movable property not subject to mandatory state registration:

free of charge.

3. Submission of cadastral information to the land plot:

Appendix 1 to the Public Service Standard: 542 tenge without VAT.

4. Presentation of information on the production of an identification document for a land plot:

Appendix 1 to the Public Service Standard: 542 tenge without VAT.

5. Submission of information on land ownership:

Appendix 1 to the Public Service Standard: 542 tenge without VAT.

6. Submission of information on the title document of the initial grant of the right to a land plot:

Appendix 1 to the Public Service Standard: 542 tenge without VAT. 

7. Providing information on the quality condition and the estimated value of the land:

Appendix 1 to the Public Service Standard: Unit of measurement: land plot up to 50 ha.

No. Types of jobs Cost, tenge (excluding VAT) The coefficient of increase in the cost of work depending on the area of the site
I. Providing information about the quality of the land
1 Reception of the application. Selection of materials for the performance of work. 1102
2 Determination of the qualitative condition of the land plot (calculation of agricultural land area, by soil varieties; distribution of farmland and arable land by reclamation groups; establishment of arable humus content). 3672 1,1 — up to 100 ha;
1,2 — up to 500 ha;
1,3 — up to 1000 ha;
for each subsequent 1000 ha, the price increases by 10%
3 Calculation of the weighted average soil bonitet score for a land plot. 2075
4 Determination of the crop condition of fodder land 734
5 Production of printed products. 303
Total: 7886  
II. Determining the estimated value of the land, providing information. up to 100 ha
I category — 9 366;
II category — 11 178;
III category — 12 160;
IV category — 13 067;
V category — 13 973
1,15 — up to 500 ha;
1,45 — up to 1000 ha;
2,6 — up to 5000 ha;
extrapolation - over 5000 ha

8. Determination of the cadastral (estimated) value of the land:

Appendix 1 to the Public Service Standard:

No Type of assessment value of the land Land area, hectare (ha); category of complexity of natural economic zones Cost of work (excluding VAT) *
in tenge from the base area of the site and the category of complexity of natural and economic zones coefficient of increase in the cost of work depending on the area of the site
1 2 3 4 5
1 Determination of the estimated value of the land provided (provided) to citizens for personal home (auxiliary) farming, construction and maintenance of a residential building, gardening and summer house construction within the limits of the free provision of land in accordance with Article 50 of the Land Code 4 607 1,3 – upon exceeding the norm of free provision by the state
2 Determination of the estimated value of the land plot provided (provided) for development or built up with buildings and structures of their complexes, including land intended for maintenance of buildings and structures in accordance with their purpose up to 1 ha 12 385 1,1 – up to 10 ha
1,2 – up to 50 ha
1,3 – up to 100 ha
extrapolation - over 100 ha
3 Determination of the estimated value of a land plot provided (provided) to citizens and non-state legal entities for agricultural production up to 100 ha

I category

II category

III category

IV category

V category

9 366

11 178

12 160

13 067

13 973

 

1,15 – up to 500 ha

1,45 – up to 1000 ha

2,6 – up to 5000 ha

extrapolation - over 5000 ha

* Note: the coefficients of the general part of the price list can be applied to the cost of work.

9. Preparation and issuance of acts on the right of private ownership of a land plot:

Appendix 2 to the Public Service Standard: The preparation of an act on the right of private ownership of a land plot to orphans and children left without parental care for a period until they reach the age of eighteen is free of charge.      

No Name of subjects Land area, hectare (ha) Cost of work (excluding VAT) *
MCI coefficient of increase in the cost of work depending on the area of the land
1 2 3 4 5
1 Individuals to conduct:      
gardening and country building   1,9  
individual housing construction   1,9  
personal subsidiary plots   1,9  
garages   1,9  
2 Peasant and farm enterprises up to 50 3,2 up to 100 ha – 1,1;
up to 500 ha – 1,2;
up to 1000 ha – 1,3;
over 1000 ha – 1,4.
3 Legal entities, small businesses up to 0,5 3,2 up to 1 ha – 1,1;
up to 10 ha – 1,2;
up to 50 ha – 1,3;
over 50 ha – 1,4.
4 Owners of premises (participants in the condominium) up to 1 5,2 up to 1,5 ha – 1,1;
up to 2,0 ha – 1,2;
up to 2,5 ha – 1,3;
over 2,5 ha – 1,4.

10. Preparation and issuance of acts on the right of permanent land use:

Appendix 2 to the Public Service Standard:

No Name of subjects Land area, hectare (ha) Cost of work (excluding VAT) *
MCI coefficient of increase in the cost of work depending on the area of the land
1 2 3 4 5
1 Individuals to conduct:      
gardening and country building 1,9
individual housing construction 1,9
personal subsidiary plots 1,9
garages 1,9
2 Peasant and farm enterprises up to 50 3,2 up to 100 ha – 1,1;
up to 500 ha – 1,2;
up to 1000 ha – 1,3;
over 1000 ha – 1,4.
3 Legal entities, small businesses up to 0,5 3,2 up to 1 ha – 1,1;
up to 10 ha – 1,2;
up to 50 ha – 1,3;
over 50 ha – 1,4.
4 Owners of premises (participants in the condominium) up to 1 5,2 up to 1,5 ha – 1,1;
up to 2,0 ha – 1,2;
up to 2,5 ha – 1,3;
over 2,5 ha – 1,4.

11. Preparation and issuance of acts on the right of temporary gratuitous land use:

Appendix 2 to the Public Service Standard: The preparation of the act on the land plot for orphans and children without parental care for the period until they reach the age of eighteen is free of charge.  

No Name of subjects Land area, hectare (ha) Cost of work (excluding VAT) *
MCI coefficient of increase in the cost of work depending on the area of the land
1 2 3 4 5
1 Individuals to conduct:      
gardening and country building 1,9
individual housing construction 1,9
personal subsidiary plots 1,9
garages 1,9
2 Peasant and farm enterprises up to 50 3,2 up to 100 ha– 1,1;
up to 500 ha– 1,2;
up to 1000 ha– 1,3;
over 1000 ha– 1,4.
3 Legal entities, small businesses up to 0,5 3,2 up to 1 ha– 1,1;
up to 10 ha– 1,2;
up to 50 ha– 1,3;
over 50 ha– 1,4.
4 Owners of premises (participants in the condominium) up to 1 5,2 up to 1,5 ha– 1,1;
up to 2,0 ha– 1,2;
up to 2,5 ha– 1,3;
over 2,5 ha– 1,4.

12. Preparation and issuance of acts on the right of temporary paid (long-term, short-term) land use (lease):

Appendix 2 to the standard of public services: The preparation of the act on the land plot for orphans and children without parental care for the period until they reach the age of eighteen is free of charge.  

No Name of subjects Land area, hectare (ha) Cost of work (excluding VAT) *
MCI coefficient of increase in the cost of work depending on the area of the land
1 2 3 4 5
1 Individuals to conduct:      
gardening and country building 1,9
individual housing construction 1,9
personal subsidiary plots 1,9
garages 1,9
2 Peasant and farm enterprises up to 50 3,2 up to 100 ha – 1,1;
up to 500 ha – 1,2;
up to 1000 ha – 1,3;
over 1000 ha – 1,4.
3 Legal entities, small businesses up to 0,5 3,2 up to 1 ha – 1,1;
up to 10 ha – 1,2;
up to 50 ha – 1,3;
over 50 ha – 1,4.
4 Owners of premises (participants in the condominium) up to 1 5,2 up to 1,5 ha – 1,1;
up to 2,0 ha – 1,2;
up to 2,5 ha – 1,3;
over 2,5 ha – 1,4.

13. Issuance of a technical passport of real estate:

Appendix 5 to the Order of the acting Minister of Investment and Development of the Republic of Kazakhstan dated January 26, 2016 No. 87 “On approval of prices for goods (work, services) produced and (or) sold by the State Corporation“ Government for Citizens ”for state technical inspection of buildings, structures and (or) their components:

No Name and characteristics of goods (work, services) Unit of measurement The norm of time, man is an hour The cost of 1 standard hour, tenge Price excluding VAT, tenge
1 2 3 4 5 6
1. State technical inspection (hereinafter - STI) of buildings, structures and (or) their components
1. Acceptance of applications for the STI of all categories of real estate
1) acceptance of documents for the state technical examination of all categories of real estate 1 statement 0,363 1291,9 469
2) search and retrieval of archive files 1 statement 0,462 1291,9 597
3) legal analysis of the documents submitted and preparatory work for the exit 1 statement 0,410 1291,9 530
4) issuing documents to the service recipient 1 passport 0,190 1291,9 245
2. STI of land plots of all categories of real estate objects (private houses, summer residences, individual garages, apartment buildings, apartments in apartment buildings, non-residential buildings and other structures and their components)
1. Primary STI of a built-up land plot with an area of up to 1000 sq.m
1) simple configuration 1 plot 0,785 1291,9 1014
2) medium configuration 1 plot 1,841 1291,9 2378
3) complex configuration 1 plot 2,778 1291,9 3589
2. The primary STI of a built-up land plot with an area of over 1000 sq.m
1) simple configuration 100 sq.m 0,130 1291,9 168
2) medium configuration 100 sq.m 0,166 1291,9 214
3) complex configuration 100 sq.m 0,284 1291,9 367
3. Primary STI of the main structure
1) first category of difficulty 1 sq.m 0,027 1291,9 35
2) second category of complexity 1 sq.m 0,035 1291,9 45
3) third category of difficulty 1 sq.m 0,046 1291,9 59
4. Primary STI Office Buildings 1 sq.m 0,008 1291,9 10
5. Primary STI of amenities (paving, children's, underwear, sports grounds, lawns, ramps, blind area and other elements) 1 sq.m 0,003 1291,9 4
6. Primary STI facilities (tanks, gas stations, tanks, gas tanks, trestles, wells, cesspools and other structures) 1 object 0,244 1291,9 315
7. Preparation of a technical passport at the initial STI 1 passport 1,476 1291,9 1907
8. Checking the technical passport during the initial and subsequent STI of all categories of real estate 1 passport 0,279 1291,9 360
9. Subsequent STI of a built-up land plot of up to 1000 sq.m
1) simple configuration 1 plot 0,549 1291,9 709
2) medium configuration 1 plot 1,288 1291,9 1664
3) complex configuration 1 plot 2,008 1291,9 2594
10. Subsequent STI of a built-up land plot with an area of over 1000 sq.m
1) simple configuration 100 sq.m 0,045 1291,9 58
2) medium configuration 100 sq.m 0,100 1291,9 129
3) complex configuration 100 sq.m 0,158 1291,9 204
11. Subsequent STI of the main structure
1) first category of difficulty 1 sq.m 0,019 1291,9 25
2) second category of complexity 1 sq.m 0,024 1291,9 31
3) third category of difficulty 1 sq.m 0,032 1291,9 41
12. Subsequent STI office buildings 1 sq.m 0,005 1291,9 6
13. The subsequent STI of amenities (paving, children's, underwear, sports fields, lawns, ramps, blind area and other elements) 1 sq.m 0,002 1291,9 3
14. Subsequent STI facilities (tanks, gas stations, tanks, gas tanks, trestles, wells, cesspools and other structures) 1 object 0,171 1291,9 221
15. Preparation of a technical passport during the subsequent STI 1 passport 1,288 1291,9 1664
3. STI roads or driveways
1. Primary STI Roads or Driveways Coated
1) first category of difficulty 1 km 17,937 1291,9 23173
2) second category of difficulty 1 km 29,837 1291,9 38546
3) third category of difficulty 1 km 44,960 1291,9 58084
2. Primary STI of unpaved roads or driveways
1) first category of difficulty 1 km 13,911 1291,9 17972
2) second category of difficulty 1 km 23,917 1291,9 30898
3) third category of difficulty 1 km 33,560 1291,9 43356
3. Preparation of a technical passport for the primary STI of roads or driveways 1 passport 1,769 1291,9 2285
4. Subsequent STI of roads or driveways coated
1) first category of difficulty 1 km 12,379 1291,9 15992
2) second category of difficulty 1 km 20,931 1291,9 27041
3) third category of difficulty 1 km 31,472 1291,9 40659
5. Subsequent STI of unpaved roads or driveways
1) first category of difficulty 1 km 9,738 1291,9 12581
2) second category of difficulty 1 km 16,742 1291,9 21629
3) third category of difficulty 1 km 22,372 1291,9 28902
6. Preparation of a technical passport during the subsequent STI of roads or driveways 1 passport 1,509 1291,9 1949
4. STI embankments
1. Primary STI embankments
1) no gatherings 100 m 1,460 1291,9 1886
2) with one gathering 100 m 1,870 1291,9 2416
3) with two gatherings 100 m 2,270 1291,9 2933
4) with three or more gatherings   2,670 1291,9 3449
2. Filling in the technical passport at the initial STI of embankments 1 passport 3,320 1291,9 4289
3. Subsequent STI quays
1) no gatherings 100 m 1,170 1291,9 1512
2) with one gathering 100 m 1,490 1291,9 1925
3) with two gatherings 100 m 1,820 1291,9 2351
4) with three or more gatherings 100 m 2,140 1291,9 2765
4. Filling in the technical passport with the subsequent STI of embankments 1 passport 1,900 1291,9 2455
5. STI bridges, overpasses and communication towers
1. Primary STI of the bridge, overpass, communication towers up to 30 m
1) Single span object 10,800 1291,9 13953
2) Multi span object 13,500 1291,9 17441
2. Primary STI of the bridge, overpass, communication tower over 30 m 10 m 5,400 1291,9 6976
3. Filling in the technical passport at the primary STI of bridges, overpasses and communication towers 1 passport 3,700 1291,9 4780
4. Subsequent STI of the bridge, overpass, communication tower up to 30 m
1) Single span object 6,480 1291,9 8372
2) Multi span object 8,100 1291,9 10464
5. Subsequent STI of the bridge, overpass, communication tower over 30 m 10 m 3,240 1291,9 4186
6. Filling in the technical passport during the subsequent STI of bridges, overpasses and communication towers 1 passport 2,500 1291,9 3230
6. STI pipelines under the roads
1. Primary STI pipelines under the roads
1) with single pipe installation 100 m 7,113 1291,9 9189
2) with double pipe installation 100 m 10,046 1291,9 12978
2. Filling in the technical passport for the initial STI pipelines under roads 1 passport 0,957 1291,9 1236
3. Subsequent STI pipelines under the roads
1) with single pipe installation 100 m 2,207 1291,9 2851
2) with double pipe installation 100 m 3,664 1291,9 4734
4. Filling in the technical passport with subsequent STI pipelines under the roads 1 passport 0,873 1291,9 1128
7. STI green space
1. Primary STI green space
1) with direct alleys and a uniform composition of rocks - street planting, boulevards and other green spaces (first category) 100 pcs 2,229 1291,9 2880
2) with partial saturation with alley landings located in separate parts of the facility - alleys, squares, house adjoining land, gardens, parks and other green spaces (second category) 100 pcs 2,911 1291,9 3761
3) with partial saturation with alley plantings having more than five breeds or more than three species homogeneous in age composition (third category) 100 pcs 3,641 1291,9 4704
4) the same objects with hedges or shrubs 100 rm 1,195 1291,9 1544
5) the same objects with shrubs or perennial flowers of the same breed, identical in age composition 100 rm 1,544 1291,9 1995
6) the same objects with shrubs or perennial flowers of different species, different in age composition 100 rm 1,973 1291,9 2549
7) accounting of equipment and small forms of garden architecture (benches, sculptures, flower vases, garbage cans, bins, lanterns and other architectural elements) 100 pcs 1,617 1291,9 2089
2. Filling in the technical passport at the initial STI 1 passport 1,811 1291,9 2340
3. Subsequent STI green spaces
1) with direct alleys and a uniform composition of rocks - street planting, boulevards and other green spaces (first category) 100 pcs 1,591 1291,9 2055
  with partial saturation with alley landings located in separate parts of the facility - alleys, squares, house adjoining land, gardens, parks and other green spaces (second category) 100 pcs 2,042 1291,9 2638
3) with partial saturation with alley plantings having more than five breeds or more than three species homogeneous in age composition (third category) 100 pcs 2,552 1291,9 3297
4) the same objects with hedges or shrubs 100 rm 1,129 1291,9 1459
5) the same objects with shrubs or perennial flowers of the same breed, identical in age composition 100 rm 1,313 1291,9 1696
6) the same objects with shrubs or perennial flowers of different species, different in age composition 100 rm 1,522 1291,9 1966
7) accounting of equipment and small forms of garden architecture (benches, sculptures, flower vases, garbage cans, bins, lanterns and other architectural elements) 100 pcs 1,107 1291,9 1430
4. Filling in the technical passport during the subsequent STI 1 passport 1,492 1291,9 1928
8. STI power grid
1. Primary STI Electric Networks
1) overhead power lines 1 km 13,083 1291,9 16902
2) cable power lines 1 km 14,669 1291,9 18951
2. Filling in the technical passport at the primary STI of electric networks 1 passport 2,409 1291,9 3112
3. Subsequent STI Electric Networks
1) overhead power lines 1 km 12,429 1291,9 16057
2) cable power lines 1 km 13,936 1291,9 18004
4. Filling in the technical passport during the subsequent STI of electric networks 1 passport 1,783 1291,9 2303
9. STI lines of urban electric vehicles
1. Primary STI of urban electric transport lines
1) contact network 1 km 28,611 1291,9 36963
2) tramway 1 km 34,333 1291,9 44355
2. Determination of the radii and lengths of the curve nodes of the contact network 1 node 11,165 1291,9 14424
3. Filling in the technical passport at the primary STI of urban electric transport lines 1 passport 2,311 1291,9 2986
4. Subsequent STI of urban electric transport lines  
1) contact network 1 km 23,175 1291,9 29940
2) tramway 1 km 27,810 1291,9 35928
5. Filling in the technical passport during the subsequent STI of the lines of urban electric transport 1 passport 1,913 1291,9 2471
10. STI of water, thermal, gas, sewer (including rain, general alloy) networks and communication lines
1. Primary STI of water, heat, gas, sewer (including rain, general alloy) networks and communication lines 1 km 12,566 1291,9 16234
2. Well (with primary STI) 1 pcs 3,237 1291,9 4182
3. Input (for initial STI) 1 pcs 0,660 1291,9 853
4. Filling in the technical passport at the initial STI of water supply, heat, gas, sewer (including rain, general alloy) networks and communication lines 1 passport 1,501 1291,9 1939
5. Subsequent STI networks of water, heat, gas, sewer (including rain, general alloy) networks and communication lines 1 km 10,681 1291,9 13799
6. Well (with subsequent STI) 1 pcs 2,752 1291,9 3555
7. Input (during subsequent STI) 1 pcs 0,561 1291,9 725
8. Filling in the technical passport during the subsequent STI of water supply, heat, gas, sewer (including rain, general alloy) networks and communication lines 1 passport 1,252 1291,9 1617
11. STI railways and subways
1. Primary STI railways and subways
1) straight section 1 km 5,067 1291,9 6546
2) curved section 1 km 6,068 1291,9 7839
2. Tunnel   2,739 1291,9 3539
3. Railway stop 1 pcs 2,658 1291,9 3434
4. Railway slide 1 pcs 2,713 1291,9 3505
5. Improvements (lighting, platforms, driveways, fencing and other structures) object 2,053 1291,9 2652
6. Railway arrow 1 pcs 1,074 1291,9 1388
7. Filling in the technical passport at the initial STI 1 passport 1,965 1291,9 2539
8. Subsequent STI railways and subways
1) straight section 1 km 3,531 1291,9 4562
2) curved section 1 km 4,088 1291,9 5281
9. Tunnel 1 km 2,057 1291,9 2657
10. Railway stop 1 pcs 1,701 1291,9 2198
11. Railway slide 1 pcs 1,764 1291,9 2279
12. Improvements (lighting, platforms, driveways, fencing and other structures) object 1,668 1291,9 2155
13. Railway arrow 1 pcs 0,766 1291,9 990
14. Filling in the technical passport during the subsequent STI 1 passport 1,216 1291,9 1571
12. STI bunds, dams
1. Primary STI bunds, dams
1) length of 30 m 1 object 7,140 1291,9 9224
2) length over 30 m 10 m 10,710 1291,9 13836
2. Filling in the technical passport at the primary STI bunds, dams 1 passport 1,170 1291,9 1512
3. Subsequent STI bunds, dams
1) length of 30 m 1 object 6,070 1291,9 7842
2) length over 30 m 10 m 9,100 1291,9 11756
4. Filling in the technical passport during the subsequent STI bunds, dams 1 passport 0,870 1291,9 1124
13. Identification of the complete demolition of buildings and structures on the land
1. Identification of the complete demolition of buildings and structures 1 plot 1,221 1291,9 1577
2. Complete demolition of buildings and structures 1 document 0,459 1291,9 593

Note:
VAT - value added tax;
PEG - the portal of "electronic government";
sq.m - square meter;
pcs - pieces (a, i)

Payment is made in two stages: when submitting an application for the provision of public services, payment is made in the form of the base cost of the state technical inspection of the property in the amount of 2465 tenge;
upon receipt of the technical passport of the property, full payment (surcharge) is made for the work performed on the state technical examination of the property.

14. Issue of a duplicate of a technical passport of real estate:

Appendix 5 to the Order of the acting Minister of Investment and Development of the Republic of Kazakhstan dated January 26, 2016 No. 87 “On approval of prices for goods (work, services) produced and (or) sold by the State Corporation“ Government for Citizens ”for state technical inspection of buildings, structures and (or) their components:

No Name and characteristics of goods (work, services) Unit of measurement The norm of time, man is an hour The cost of 1 standard hour, tenge Price excluding VAT, tenge
1. Reception of documents (applications, receipts for payment for services) and search for real estate in the state database "Real Estate Register" 1 statement 0,19 1291,9 245
2. Search and receipt of inventory of the property from the archive fund 1 statement 0,462 1291,9 597
3. Legal analysis of inventory and registration of a duplicate technical passport 1 duplicate 0,55 1291,9 711
4. Issue of duplicate technical passport 1 duplicate 0,12 1291,9 155
15. Entering into the information system of the legal cadastre of identification and technical information of buildings, structures and (or) their components for newly created real estate 1 service 6,75 652,3185 4403,15
2. Determination of the value of objects of taxation
1. Preparation for assessment and maintenance of information 1 report 0,94 289,4 272
2. Appraisal of the apartment 1 object 0,33 289,4 96
3. Assessment of an individual residential building, cottage 1 object 0,36 289,4 104
4. Assessment of garage parking 1 object 0,2 289,4 58

15. The issuance of information on the receipt and movement of funds of the depositor of the unified pension fund:

free of charge.